Electricity Connection Policy

On the 2nd November 2017 the CRU published a proposed decision on the Enduring Connection Policy – Stage 1 (ECP-1). This proposed decision is further to the CER/15/284 consultation and sets out the CRU’s detailed policy proposals for connection to the electricity system.

Alongside the proposed decision, and to enable successful and timely implementation of the enduring connection policy, the CRU has also issued a direction to the system operators on the transition to ECP-1 (D/17/19787).

Download PDF